Use this article to build and apply schedule templates, import a schedule from a CSV, make one-off schedule changes, and export or audit your team's schedule.
There are three ways to get activities onto your team’s schedule: apply a schedule template to roll out a repeating week or day pattern across a group of teammates, import a schedule from a CSV if you plan shifts in a spreadsheet, or add and edit activities directly on a teammate’s row for one-off changes. You can combine them: apply a template or import a file, then adjust individual days as things change.
Before you start, you need at least one activity type set up. See How to use calendar settings in Workforce Management.
Note: Workforce Management is included in the Pro add-on, including Pro add-on trials. Workspaces without it don't see Workforce in the navigation. This article is for teammates with the Can manage Workforce permission.
What is a schedule template?
Schedule templates are reusable week or day patterns you apply to a group of teammates. A template defines what each day looks like, for example inbox time, meetings, and breaks, and can be applied repeatedly across multiple weeks.
View and manage templates under Workforce > Configure > Schedule Templates. The list shows each template's type (Week or Day), the number of teammates, the number of events, and its timezone.
Templates are daily or weekly. For regular individual constraints, for example a teammate who only works Tuesday to Saturday, build that pattern into the template, or have the teammate block their Google Calendar if sync is on.
How to create a schedule template
Click New template.
Give it a name, for example “EMEA Week Pattern”.
Under Template length, choose Week or Day.
Under Timezone, choose the timezone to anchor the template in. Pick the timezone the teammates on this template work in; you can set a different timezone for each template if you plan across regions.
Click Create template.
The template opens empty. To add teammates, click Teammates in the top right, search for and Add each teammate, then click Done. Each teammate you add starts with a 9–10am event you can adjust.
Click an empty part of a teammate’s row (or click and drag across the hours you want) to open the Add event dialog:
Choose the Activity type.
Set the Duration using a preset (15m, 30m, 1h, 2h, up to 9h) or type a number of minutes.
Optionally add a Title. If you leave it blank, the event uses the activity type’s name.
Click Add.
Drag an activity to move it, including onto another teammate's row, or drag its edges to resize. Moves, resizes, edits, and deletions show as unsaved changes until you click Save changes in the bar at the bottom of the editor. Click Discard to undo them. Apply template is unavailable until you save or discard your changes. Use the day picker at the top (it shows the current day, for example Monday) to switch days in a week template, or choose Week to see every day at once. Use Search teammates to find a row in a large template.
How to duplicate a template, a day, or a teammate’s events
There are three ways to copy in schedule templates, and they work at different levels. Pick the one that matches what you want to reuse.
Duplicate a whole template
Use this to create a variant of an existing template, for example a summer version of your standard week, without starting from scratch.
Open the ⋯ menu on the template’s row and select Duplicate.
The copy appears in the list as “[Template name] (copy)” with the same type, teammates, events, and timezone. Use Rename & timezone in its row menu to give it a new name.
Duplicate a day within a template
Use this to build a week faster: set up one day, then copy it to the others.
Open the template and use the day picker to select the day to copy from, for example Monday.
Click Duplicate day. The dialog shows how many events it will copy, for example “Duplicate 11 events from Thursday”.
Under Duplicate to, select one or more days. A number beside a day shows how many events it already has.
If any selected day already has events, choose an option under Action for existing events: Replace existing events clears those days first, or Add to existing events keeps what’s there and adds the copied events on top.
Click Duplicate.
Copy a teammate’s events to other teammates
Use this to give several teammates the same pattern within a template.
Open the template and switch the day picker to Week to see every day at once, or stay on a single day.
Open the ⋯ menu on the teammate’s row and select Copy events to teammates.
Search for and select the teammates to copy to, then click Copy events.
Existing events on those teammates stay, and you can copy up to 50 events at once. The same row menu also has Remove teammate, which takes the teammate and their events out of the template.
How to apply a template
Go to Workforce > Staffing.
Click Apply template.
Select a template.
Pick the date to apply it to. For a week template, pick any day in the week you want to fill (weeks run Sunday to Saturday). To apply it more than once, select Repeat for and enter up to 5 weeks, or up to 5 days for a day template. To cover a longer period, apply the template again starting from the week after the last one.
Under When events already exist, choose how to handle conflicts:
Add alongside existing events (default) keeps what’s already scheduled, including events from earlier template applications. Where an existing event covers the same time, both stay and overlap, so applying the same template twice creates duplicates. Resolve overlaps by hand on the Staffing page.
Replace earlier template events removes events from earlier template applications in the selected period. Events you added by hand are kept.
Review the Summary (dates, teammates, events, timezone and, if Google Calendar sync is on, the calendars it syncs to), then click Apply template. The schedule view updates immediately to show the newly applied events.
Note: Replace earlier template events only removes events from earlier template applications. Events you created by hand, such as “PTO” or “Off sick” added directly on the Staffing page, and events synced from Google Calendar are never removed or overwritten.
Note: You can change a maximum of 3,000 events in one application. If you go over, select fewer repeats or edit the template to have fewer events.
Does applying a schedule template notify teammates? No, applying a schedule template doesn't send teammates a notification, because Workforce Management doesn't send notifications when a schedule is applied or changed. You can apply a template to test it without alerting anyone. If Google Calendar sync is on, applied events are pushed to each connected teammate's Google Calendar, so teammates may see them there.
How do teammates see an applied schedule? Teammates can see their own schedule on the Workforce > My schedule page. They don't need Google Calendar, an exported file, or any Workforce permissions. See How to view your schedule in Workforce Management.
How to import a schedule from a CSV
If you plan shifts in a spreadsheet, you can upload up to 200 events at once instead of adding each activity by hand. One file can cover any mix of teammates, activity types, and timezones.
Go to Workforce > Staffing.
Open the menu on the Apply template button (the arrow on the right) and choose Import schedule.
Choose your CSV file, then click Import. To start from a ready-made file, click Download an example file.
Once the import finishes, a confirmation message shows the dates covered and how many events and teammates were imported, for example “Jan 20 – Jan 24 · 120 events for 8 teammates”. Click Show on schedule to jump to that date range.
Prepare your file
Each row is one activity, so breaks and lunches go on their own rows. The file needs these five columns, in any order:
teammate_email: the teammate’s Intercom login email. The teammate must be in the workspace and belong to a workstream.
activity_type: the name of an existing activity type, for example Inbox Time or Lunch. Upper or lower case doesn’t matter.
timezone: a timezone name such as America/New_York or Europe/London. Each row can use a different timezone.
start and end: the date and time in MM/DD/YYYY HH:MM format, in that row’s timezone, for example 01/20/2025 09:00. The end must be after the start, each event can last up to 31 days, and the start must be within the last year or the next two years.
Files can be up to 1 MB and contain up to 200 events. For larger schedules, split them across several files.
Dates must be written month first (MM/DD/YYYY). A day-first file will either fail to import or be read as the wrong dates. A file from Export schedule can’t be re-imported as it is, because it uses a different date format (YYYY-MM-DD).
Note:
Importing adds events alongside what’s already scheduled. It doesn’t replace existing events, so importing the same file twice creates duplicates. To redo an import, delete the imported events first.
An import can’t be undone in one step. Imported events need to be edited or deleted individually.
The import doesn’t create teammates’ workstreams or activity types. Set these up first under Workforce > Configure > Workstreams and Workforce > Configure > Activity Types.
Imported events behave like any other Workforce event. If Google Calendar sync is on, they’re pushed to each connected teammate’s calendar. Large imports can take a few minutes to fully appear there.
You need the Can manage Workforce permission to import a schedule.
How to add a one-off activity
To add a single activity to a teammate's schedule on the Workforce > Staffing page, such as a one-off meeting, an extra break, or any intraday adjustment, add it directly on their row:
Click an empty part of the row to drop a standalone activity, then choose its activity type.
Or click and drag across the hours you want to set the activity's length as you create it.
Drag an existing activity to move it, drag it onto another teammate's row to reassign it, or drag its edges to resize. To change an activity's type, title, or times, or to delete it, click it to open Edit Event. Moves, resizes, edits, and deletions show as unsaved changes until you click Save changes in the bar at the bottom of the schedule. Click Discard to undo them. New activities are saved as soon as you add them. When you view 2 days or fewer, dragging snaps to 15-minute steps. On longer date ranges, it snaps to whole hours. For exact times, click the activity and set its Start time and End time. A single activity can last up to 31 days, for example a block of PTO. The Forecast and coverage views show a minimum of 1 hour.
You need at least one activity type set up first. See How to use calendar settings in Workforce Management.
Note: Where Google Calendar sync is on, creating an event on the Staffing page or applying a template pushes it to each connected teammate's Google Calendar. These events can't be changed from Google Calendar: moving, renaming, or deleting them there has no effect on the Workforce schedule. Make schedule changes in Workforce.
How to export a schedule
Export the schedule you're viewing as a CSV (comma-separated values), for sharing outside Intercom or keeping a record of what was scheduled.
Go to Workforce > Staffing.
Set the filters and date range you want to export.
Click Export schedule, check the date range, workstreams, and timezone in the Export schedule dialog, then click Export schedule to confirm. The CSV file downloads to your browser's default download location.
The export covers the teammates and date range currently in view, so filter before you export. It includes every saved event for those teammates and dates: events from applied templates, one-off activities, and events synced from Google Calendar. Events of any activity type you've filtered out aren't exported. If you have unsaved changes, save or discard them first. Export schedule is unavailable until you do. You can export past and future events.
The file contains one row per activity with these columns:
Column | What it contains |
teammate_id | The teammate's Intercom ID |
teammate_name | The teammate's name |
teammate_email | The teammate's email address |
activity_type | The name of the activity type |
productive | TRUE or FALSE, from the activity type's productivity setting |
timezone | The timezone the start and end times are in, for example Europe/London |
start | Activity start, as YYYY-MM-DD HH:MM |
end | Activity end, as YYYY-MM-DD HH:MM |
Anyone with Can access Workforce and Can view all teammate and team details can export. Can manage Workforce isn't required.
Note: You can export up to 31 days and 200 teammates at a time. Export schedule is disabled if your selection exceeds either limit; narrow your filters or date range, or export in batches.
How to see when an event was last updated
Click any event on the Staffing page to see when it last changed and who changed it, so you know the shift in front of you is current before you plan around it.
Events created in Workforce show "Last updated 2 hours ago by [name]".
Events synced from Google Calendar show "Last synced 2 hours ago from Google Calendar". The time only changes when a sync actually changed the event.
No extra permission is needed; anyone with Can access Workforce sees the stamps.
Need more help? Get support from our Community Forum
Find answers and get help from Intercom Support and Community Experts






